Project Summary
The development of a dairy irrigation supply consisting of a groundwater take of 406,800m³/yr, from two production bores >100m deep which tap the Awhitu Peninsula Kaawa aquifer, and a run-of-stream take of 465,700m³/yr.
Services Provided
- Desktop study of hydrogeological/hydrological context.
- Drilling liaison and pump testing.
- In-stream flow monitoring with a weir.
- Assessment of Environmental Effects (AEE).
- Saline Intrusion monitoring.
Project Conclusion
This project secured groundwater and surface water abstraction rights, demonstrating that the proposed takes align with sustainable allocation limits and regulatory requirements.
